QUANTITY SURVEYING & COSTING - II syllabus

QUANTITY SURVEYING & COSTING - II



Subject Code
15508
Sessional
No of Period in one session : 50
          No. of Periods Per Week
Full Marks
:
50
L
T
P/S
Annual Exam.
:
30
-
-
4
Internal Exam.
:
20

Rationale:
This is a core technology subject which will enable the students to learn core facts, concepts, principles & procedures in Estimating & Costing. With this knowledge and skill, he will be able to prepare estimate before start of construction and systematically procure materials during execution using specifications for ensuring appropriate type of construction processes & quality of engineering products in specialized areas in Building Construction, Irrigation, Transportation and Environmental Engineering.

Objectives:
Students should be able to:
1)  Decide Approximate Cost of Civil Engineering Structure.
2) Prepare check list of items of construction.
3) Prepare estimate for civil engineering work.
4) Prepare rate analysis of item of construction.
5) Take measurement of completed work.
6) Compare actual quantity with estimated quantity.

Assignments:
Skills to be developed:

Intellectual Skills:
a. List various items of work with their units in a Civil Engineering Structure.
b. Calculate quantities of various items of work.
c. Prepare rate analysis.
List of Sessional Work:
1) Prepare Check list of items of following type of Civil Engineering works.
a) Load Bearing type Building
b) Framed structure type building
c) W.B.M.Road
d) Septic Tank
e) Community well
2) Writing the rules of deduction’s for below mentioned items of work as per IS 1200.
a) Brick / Stone masonry.
b) Plastering / Pointing
3) Taking out quantities of various items of work for load bearing building.
i) Earth work in excavation for foundation
ii) Base Concrete of foundation
iii) U.C.R./BB Masonry work in foundation and plinth.
iv) D.P.C.
v) Plinth Filling.
vi) Brick work in masonry.
vii) Flooring
viii) Plastering.
ix) Wood work in doors & windows
4) Taking out quantities of following items for small R.C.C. Hall
i) Concreting for footing, Column, Beam, slab.
ii) Reinforcement for above items by preparing Schedule of bars.
iii) Form work for all above items.
5) Preparing detailed estimate of a RCC single & two storied residential building for
all items of work. (The quantity of reinforcement shall be calculated by percentage.)
6) Preparing Rate analysis of following items:
Building work – Brick work, P.C.C., R.C.C., Plastering, Flooring, Doors, Windows.
7) Taking out quantities of earth work for a Road profile prepared in surveying subject.
Prepare the lead statement.
8) Taking out quantities of work for a Community well or Jack well or Septic Tank.
9) Taking out quantities of work for pipe culvert.

(Drawings shall be provided for the above exercises by subject teacher.)


1.  Reference Books:

Sl.
No.
Title

Author

Publisher

1.

Estimating & costing in Civil Engineering
B.N. Datta

UBS Publishers Distributors
Pvt Ltd New Delhi
2.

Estimating & costing,
Specification and Valuation in Civil Engineering
M. Chakraborti

M. Chakraborti , Calcutta


3.
Estimating & costing
S.C. Rangwala
Charotar Publication Anand
4.
Civil Engineering Estimating,
Contracts and accounts Vol . I
B.S. Patil

Orient Longman, Mumbai

5.
Estimating & costing
G. S. Birdie
Dhanpat Rai and Sons Delhi

2. Video Cassettes /CDS:

Sl. No.
Title
1.
Q. E. PRO software

3. IS/INTERNATIONAL CODES:


Sl. No.
Title
1.
IS 1200- Method of Measurement of building and Civil engineering works

No comments: